Summary
- Dimension(L*W*H):13120×2500×3990mm
- Weight:34000kg
- Power(W):297kw
- Model Number:HB52K
- Brand Name:XCMG
- Place of Origin:China
- Power Type:Diesel
- Certification:ISO9001
- Max.speed:90
Specifications
- weight:34000.000kg
- Condition:New
- Moving Type:Wheel
- Chassis Manufacturer:Sinotruk
- Wheelbase:4800+1400mm
- Engine Max. power:297kw
- Emission standard:Eruo IV
- Theoretical output:130m³/h
- Concrete pumping pressure:8MPa
- Theoretical pumping times:25Time/min
- Delivery cylinder diameter×stroke:φ260×2000mm
- Filling height:1580mm
- Placing boom structure:6RZ
- Reach height/depth/Slewing radius:51.5/36.1/46m
- Slewing angle:±270°
HB52K Truck-Mounted Concreted Boom Pumps
1、XCMG V7 series truck mounted concrete pump is a new generation equipment
which is developed by XCMG and SCHWING Germany technology.
2、It is highly reliable and durable with seven technical
highlights. More advanced boom structure technology ,More
efficient rock valve pumping technology, Steadier stabilizer structure
technology, Steadier reversing buffering technology, more reliable
fully-hydraulic reversing technology, Ultra-low pressure loss hydraulic system
technology, safer and smarter electrical control system.
Description |
Unit |
Parameter value |
|||
Outline dimension |
mm |
13120×2500×3990 |
|||
Overall weight |
kg |
34000 |
|||
Chassis |
Model |
ZZ5347V484MD1 |
|||
Manufacturer |
Sinotruk
Group Jinan Truck Co., Ltd. |
||||
Max. speed |
km/h |
90 |
|||
Max. grade-ability |
% |
40 |
|||
Wheelbase |
mm |
4800+1400 |
|||
Tire |
315/80R22.5 |
||||
Engine |
Model |
MC11.40-40 |
|||
Max. power |
kW |
297 |
|||
Max. torque |
N·m/(r/min) |
1900/1000~1400 |
|||
Displacement |
L |
10.518 |
|||
Emission standard |
Eruo IV |
||||
Pumping system |
Theoretical output |
m³/h |
170 |
||
Concrete pumping pressure |
MPa |
8 |
|||
Theoretical pumping times |
Time/min |
23~26 |
|||
Delivery cylinder diameter ×stroke |
mm |
φ260×2000 |
|||
Max. diameter of pumping concrete |
mm |
≤40 |
|||
Filling height |
mm |
1580 |
|||
Concrete slump range |
cm |
8~23 |
|||
Placing boom |
Reach height |
m |
51.5 |
||
Reach depth |
m |
36.1 |
|||
Slewingradius |
m |
46 |
|||
Slewing angle |
° |
±270 |
|||
Unfolding angle of the 1st section |
° |
90 |
|||
Unfolding angle of the 2nd section |
° |
180 |
|||
Unfolding angle of the 3rd section |
° |
180 |
|||
Unfolding angle of the 4th section |
° |
240 |
|||
Unfolding angle of the 5th section |
° |
210 |
|||
Unfolding angle of the 6th section |
° |
120 |
|||
Stabilizer span |
Longitudinal span of stabilizer |
mm |
9540 |
||
Transverse span of front stabilizer |
mm |
9150 |
|||
Transverse span of rear stabilizer |
mm |
10060 |
|||
Others |
Transfer tube |
Rock valve |
|||
Lubrication method |
Automatic lubrication |
||||
Control method |
Manual/remote control |
||||
Volume of water box |
L |
1200 |
|||
|